A Written Scheme of Examination sets out how and when a pressure system should be examined to ensure it remains safe to use. It identifies the parts of the system that require examination, the nature of those examinations, and the intervals at which they must take place.
The scheme is tailored to the specific system and operating conditions, ensuring examinations are appropriate, proportionate, and compliant with current regulations.
A Written Scheme of Examination is required for most pressure systems, including those used in heating, hot water, and pressurised plant installations.
It is typically needed when:
A new pressure system is installed
Existing systems are being reviewed or modified
Examination intervals are due
Insurers or compliance audits request updated documentation
Responsibility for when a system changes hands
Having a clear, up-to-date scheme in place helps reduce risk and avoid unnecessary downtime.
Our engineers have practical experience working with pressure systems across a wide range of commercial environments. This allows us to produce Written Schemes that reflect how systems actually operate, not just how they look on paper.
We take a clear, straightforward approach, ensuring schemes are easy to understand and aligned with the real-world condition and use of your equipment.
With nationwide coverage, we can support organisations with single sites or multi-site portfolios.
A well-prepared Written Scheme of Examination supports safe operation, planned maintenance, and ongoing compliance with pressure systems regulations.
We work closely with clients to ensure schemes remain relevant over time and can support follow-on services where required, helping you manage your responsibilities with confidence.
Speak to our engineers to arrange a Written Scheme of Examination